How to handle extra work with a change order
The job grows once you are on site: rot behind the wall, a request for one more room. A change order turns that surprise into an agreement both of you have seen.
Why use a change order
Disagreements about the final bill usually trace back to extra work nobody wrote down. A change order is a short document that records what changed, what it costs and that the customer agreed. It protects you, and it protects them from a surprise.
When you need one
- You find something you could not see when you quoted, such as damage behind a wall or a floor in worse shape than it looked.
- The customer asks for something new: another room, a different material, an upgrade.
- The scope changes in any way that affects the price or the schedule.
The steps
- Stop before you do the extra work, and show the customer what you found, with a photo if you can.
- Explain what is needed and why, in plain words.
- Price the change on its own, separate from the original quote.
- Write it up, with the old total, the change and the new total, and any effect on the schedule.
- Get the customer's agreement in writing before you start.
- Add the approved change to the final invoice.
What to say
Be calm and specific. You are solving a problem with them, not springing a charge.
While opening the wall I found water damage behind the tile. I don't want to cover it up. I'll write up the extra work and what it costs, and once you've approved it I'll go ahead.
What to write on it
- The job it belongs to, the date and a change order number
- A description of what is being added, removed or changed, and why
- Itemized lines with quantities and units, like the original quote
- The original total, this change and the new total
- Any change to the start or finish dates
- A place for the customer to approve, with their name and the date
If the customer says no
That is their right. Explain the consequence honestly: if the problem is left, what might happen. If you cannot do the original work properly without the change, say so and agree what to do before you continue. Note the conversation in writing either way.
Free template to go with this
- Change order form template: print it or download the PDF.